搜索结果: 1-15 共查到“工学 Installation”相关记录22条 . 查询时间(0.049 秒)


Efficient Pipe Installation Support System for Module Build
Space-Borne Scanner System 3D Sensors Aerial Survey
2015/12/16
The number of large industrial plants being planned and constructed in Japan has increased tremendously in recent times. By
reducing the construction costs involved in the development of these plants...
AUTOMATIC ANALYSIS AND CLASSIFICATION OF THE ROOF SURFACES FOR THE INSTALLATION OF SOLAR PANELS USING A MULTI-DATA SOURCE AND MULTI-SENSOR AERIAL PLATFORM
3D reconstruction aerial trike photogrammetry infrared thermography point cloud buildings solar influence solar panel
2015/3/3
A low-cost multi-sensor aerial platform, aerial trike, equipped with visible and thermographic sensors is used for the acquisition of all the data needed for the automatic analysis and classification ...
Design And Installation Of Heating System For Umass Solar Habitat I
Design And Installation Of Heating System Umass Solar Habitat
2014/10/21
Design And Installation Of Heating System For Umass Solar Habitat I.
Design And Installation Of A Heating System For A Solar And Windpower Heated Home
Design And Installation Of A Heating System A Solar Wind Power Heated
2014/10/21
Design And Installation Of A Heating System For A Solar And Windpower Heated Home.
Indoor Air Quality Measurement with the Installation of a Rooftop Turbine Ventilator
Indoor Air Quality Rooftop Turbine Ventilator Computational Analysis
2012/11/12
The present paper presents a numerical analysis of the difference in comfort level inside a room of a residential building when roof top turbine ventilator is installed. This analysis simulates variou...
Risk and Reliability Analysis of Deepwater Reel-Lay Installation: A Scenario Study of Pipeline during the Process of Tensioning
Reel-Lay Installation Risk Analysis Reliability Analysis Monte Carlo Simulation Ergonomics
2012/9/28
In terms of reel-lay installation in deep water, studies on the pipeline during the process of tensioning have been completed based on theories of risk and reliability analysis and Ergonomics. Qualita...
Dynamic numerical simulation of coal mine fire for escape capsule installation
Coal mine fire Dynamic numerical simulation Escape capsule Personnel evacuation
2011/9/29
Fire in mine laneway leads to disordered ventilation system airflow, and smoke will result in staff poisoning.In such situation, it necessitates to install a rescue capsule in the common staff area. I...
Theoretical analysis and experimental research on toggle-brace-damper system considering different installation modes
Toggle-brace-damper Energy dissipation Seismic Viscous damper
2011/8/29
The toggle-brace-damper system has been proven to be the most effective system for the energy dissipation of stiff structures. However, the expected effect of the toggle-brace-damper system depends la...
The Influences of Diesel Particulate Filter Installation on Air Pollutant Emissions for Used Vehicles
Diesel vehicle Smoke Particulate matter Diesel particulate filter PAHs
2011/3/28
Three kinds of diesel particulate filters (DPFs) were installed on used diesel-powered vehicles to investigate their
influences on air pollutant emissions. The air pollutant emissions were measured b...

《Debian GNU/Linux: Guide to Installation and Usage》(图)
Debian GNU/Linux: Guide to Installation and Usage John Goerzen Ossama Othman
2009/5/31
Excerpt
Debian is free in this sense: You are free to modify and redistribute it and will always have access to the source code for this purpose. The Debian Free Software Guidelines describe in more...
秦山三期工程728MW汽轮机设备及安装特点(The 728MW Steam Turbine Plants and Installation Characteristics for Qinshan Phase III CANDU Project )
秦山三期 汽轮机 安装 坎杜
2008/10/29
简要介绍了秦山三期项目中日立公司生产的728 MW汽轮机本体设备特点,现场安装特点及新工艺,通过有效的实施,保证了汽轮机的安装质量。
600MW反应堆冷却剂系统主管道安装监理(The Installation Techniques and Supervision for 600MW Reactor Coolant Piping )
秦山二期 反应堆冷却剂系统 主管道
2008/10/22
论述了秦山核电二期工程600 MW反应堆冷却剂系统主管道的安装、焊接技术及监理要点,并对反应堆冷却剂系统主管道的安装顺序、安装技术要求、焊接质量检验方法以及焊接变形的控制等方面给予了详细的阐述,对核电站反应堆冷却剂系统主管道安装焊接的质量控制具有借鉴作用。
主热传输系统管道安装技术及不符合项分析(The Installation Techniques for Primary Heat Transfer Piping and Non-Conformance Analysis )
安装技术 管道 主热传输系统
2008/9/8
介绍了秦山三期工程主回路大口径管道安装的技术要求和监理内容概要,分析了安装过程中出现的不符合项,阐述处理措施。