搜索结果: 1-15 共查到“核科学技术 Review”相关记录16条 . 查询时间(0.046 秒)
BWRX-300 completes Phases 1 & 2 of Canadian pre-licensing review(图)
BWRX-300 加拿大 预许可审查 第1阶段 第2阶段
2023/3/15
IAEA Team in Uzbekistan Concludes Site and External Events Design (SEED) Review for the Country’s First Nuclear Power Plant(图)
原子能机构 核电厂 场址 外部事件设计评审
2023/1/27
IAEA Concludes Long Term Operational Safety Review of Spain’s Ascó Nuclear Power Plant(图)
国际原子能机构 西班牙 阿斯科核电厂 长期运行 安全评审
2021/7/30
IAEA Concludes Long Term Operational Safety Review of Bulgaria’s Kozloduy Nuclear Power Plant(图)
国际原子能机构 保加利亚 科兹洛杜伊核电厂 长期运行 安全评审
2021/7/16
Experts to Review and Share Nuclear Rules--IAEA International Conference and African Forum to Open in South Africa(图)
Nuclear Rules IAEA International Conference African Forum South Africa
2009/12/11
As more countries become involved in the nuclear industry, the need to maintain high levels of safety and security worldwide is also becoming of paramount importance.One of the fundaments of nuclear s...
Safety Experts Complete Second IAEA Regulatory Review of UK Nuclear Regulator
Safety Experts Second IAEA Regulatory UK Nuclear Regulator
2009/10/13
Nuclear safety experts today concluded a 10-day mission to peer-review the UK Nuclear Regulator: Health and Safety Executive (HSE), Nuclear Directorate (ND).At the request of the UK Government, the In...
A Critical Review of the Recent Improvements in Minimizing Nuclear Waste by Innovative Gas-Cooled Reactors
Minimizing Nuclear Waste Innovative Gas-Cooled Reactors
2009/9/3
This paper presents a critical review of the recent improvements in minimizing nuclear waste in terms of quantities, long-term activities, and radiotoxicities by innovative GCRs, with particular empha...
Review of Available Data for Validation of Nuresim Two-Phase CFD Software Applied to CHF Investigations
Available Data Nuresim Two-Phase CFD
2009/9/3
The NURESIM Project of the 6th European Framework Program initiated the development of a new-generation common European Standard Software Platform for nuclear reactor simulation. The thermal-hydraulic...
压水堆定期安全审评(Periodic Safety Review of PWR)
定期安全审评 符合性检查 安全再评价
2008/11/19
主要介绍了法国压水堆核电站定期安全审评(PSR)情况,并对我国压水堆核电站定期安全审评作一简单介绍。
秦山三期核岛安装与管道预制工作总结(The General Review of NI Erection and Piping Pre-fabrication for Qinshan Phase III Project )
秦山三期 核岛安装 管道预制 施工经验
2008/11/13
全面回顾与总结了二三公司在秦山三期施工中的经验与体会,阐述了在核岛施工中不断取得优异成绩的原因。